Brentwood - Update On Construction
The mould for the foundation of the new building is seen here, ready to have concrete poured. In the distance the square frame of the elevator shaft emerges above ground.
The foundation wall is ready to support the new building - seen here from the south.
Heavy equipment is needed throughout most of the construction phase - here to help lift boards into place for the foundation mould.
Inside the old building, the ceiling on the main floor has been stripped down to the joists. Soon daylight will penetrate the buiding further, for more windows will accentuate this part of the building in the new design.
